FAIR_Power Converters for SIS100 Extraction Septum Magnets 2 and 3

Veröffentlichung (ABl.)

05.05.2026

Vergabedatum

05.05.2026

Geschätzter Auftragswert

1,9 Mio. €

Vertragslaufzeit

16.0 Monate

Verfahrensart

Verhandlungsverfahren mit Bekanntmachung

Eingegangene Angebote

2 eingegangene Angebote

Sitz des Auftraggebers

Darmstadt (64291) — DE711

Beschreibung

A new international scientific research centre facility FAIR (Facility for Antiprotons and Ion Research) is under constructed next to the existing GSI Helmholtz Centre for Heavy Ion Research. FAIR will provide antiproton and ion beams of unprecedented intensity and quality. One of the essential parts of FAIR will be the Heavy Ion Synchrotron (SIS)100. High current Extraction Septa 2 and 3 magnets are components of the SIS100, which will be powered by 2 power converters. The current in the magnets must be ramped up to 13000 A with an absolute accuracy of 100 ppm. The maximum output voltage is of up to 100V. These power converters will be feed by 20kV supply system. In Table 4.1 of the Detailed Specification, ANNEX 3, the specified maximum available installation space for the power converters is to be understood as a preliminary guideline. Deviations from this requirement may be acceptable under certain circumstances and can be discussed during the negotiation phase, if necessary.

CPV-Codes

31643000

Lose (1)

LOT-0001FAIR_Power Converters for SIS100 Extraction Septum Magnets 2 and 3

2 power converters

3164300016 Monate

Zuschlagskriterien

Consideration of the price through the valuation method "Preis-Quotient-Methode"